raw · articles · ingested 2026-02-10

Andy's Shack — Double Play / Radiator Project

Source: Steve Baer / Zomeworks archive

Temperature monitoring and radiator installation


Installation details (6/12–6/15/00)

  • 8” PVC pipe × 7’ × 10 = 250 gallons
    Temp taken @ middle of pipe & 3’ from floor

  • 65 sq. ft. of copper radiator space on roof kept dry

  • Radiators kept on all night


Temperature charts

Chart 1 (6/27/02): Andy Shack, white plate, Andy Pipe, ambient

Chart 1

Chart 2 (6/12–6/15/00): Shack water vs. shack air vs. ambient — 8” PVC pipe storage with roof-mounted copper radiators

Chart 2


Source: Zomeworks project documentation. Text extracted by OCR from scanned document.
Images: andy-shack-project-1.png | andy-shack-project-2.png